Home > House Construction > Chok Dee #1

Last additions - Chok Dee #1
IMG_4820.jpg
Metal GateThe gate metal work being done offsite. Even with a simple gate design, which I highly recommend as the normal elaborate Thai style gates I find ugly, some parts cannot be done by normal site workers, such as the circle rounds, as a machine is used to bend the metal. Normally outsourcing metal work is worth it since the finishing will be more detailed.dozerSep 27, 2011
IMG_4848.jpg
Caulk Application to Counter InsertsHere caulk is being applied to the joint between the wood counter door inserts and the inside of the opening. dozerSep 27, 2011
IMG_4726.jpg
Taping for Paint ApplicationThe taped kitchen wall exhaust fan and in the upper corner the taped decorative glass blocks. The windows come with pre applied plastic which will be removed after the paint is applied, so these don't need to be taped.dozerSep 27, 2011
IMG_4728.jpg
Bathroom Terrazzo CounterThe nearly finished bathroom terrazzo counter. Terrazzo counter or floors can be done with various colorations (achived by adding a pigment with white portland cement) and stones (sizes and colors).dozerSep 27, 2011
IMG_4735.jpg
Skirting BoardThe skirting board is brand shera (same as the soffit material). It is affixed by drilling holes in the concrete wall and inserting a plastic grommet. Then a hole is drilled in the skirting board which then is drilled into place. The screws are countersunk so they are level with the surface. Then a white plaster is applied (as seen) to make the screw head undetectable. dozerSep 27, 2011
IMG_4654.jpg
Terrazzo Counter PolishingA wet polish is done after the concrete has cured an adequate amount of time. Terrazzo takes an extended period of time and work hours to install.dozerSep 27, 2011
IMG_4660.jpg
Drive Way ColumnsThe front columns are to be poured within the decorative red bricks, which will act as forms. These bricks differ from the standard red brick in there size and the fact that they don't have holes in them.dozerSep 27, 2011
IMG_4673.jpg
Terrazzo Counter Slurry CoatAs one of the final steps in the terrazzo counter, a slurry coat is applied. This fills in any voids in the finished surface.dozerSep 27, 2011
IMG_4677.jpg
Soffit CaulkingThe soffit underside is caulked to fill in any irregular gaps. Notice the use of plastic before the soffit painting begins. For some reason Thai workers don't like to use any kind of masking material as a preventative, it takes continued perseverance to get it to happen.dozerSep 27, 2011
IMG_4697.jpg
Taped Exhaust VentThe taped exhaust vent mounted in the soffit underside prior to the detail paint application. One thing that must be minimized with masking tape is the amount of time it is affixed to the masked surface, after time it tends to leave a hard to remove glue residuedozerSep 27, 2011
IMG_4718.jpg
Aluminum Windows + Door MaterialThe aluminum windows and door material. These are custom made according to the measure done by the manufacturers. These are the thicker white aluminum material. dozerSep 27, 2011
IMG_4720.jpg
Terrazzo CounterFinal part of rubbing in the slurry coat. After this the finish is polished. dozerSep 27, 2011
219 files on 19 page(s) 4