happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > House Construction > Chok Dee #1

Last additions - Chok Dee #1
IMG_3464.JPG
12 mm SD 30 RebarClose up of the back corner of the metal ground beam frame with extra rebar support. The 12 mm rebar is SD 30.
dozerSep 27, 2011
IMG_3485.JPG
Ground Beam Exterior Wood FormForm wood is used on the outside to support the pour of the ground beam.
dozerSep 27, 2011
IMG_3491.JPG
Form workThis shows the nearly completed form work.dozerSep 27, 2011
IMG_3518.JPG
Beam Formwork after FillThis shows the foundation ready to have the ground beam poured. Cinderblocks have been used in the form work inside the house, form wood is used with supports on the exterior. dozerSep 27, 2011
0803061018ExtFrontFromRight.jpg
External Front Right ViewOn the sides of the house there are decorative glass blocks (a row two high) above the windows. The windows and doors will be of high grade aluminum. dozerSep 27, 2011
080230827BathRPanLi85_.jpg
Bathroom View 3dozerSep 27, 2011
0802221236BathRShSidei95_.jpg
Bathroom View 2Notice the two level ceiling which adds a bit of depth to the roomdozerSep 27, 2011
0802250835BathRShSidei95.jpg
Bathroom View 1The bathroom is 2m x 3m. There are colored glass blocks used in the shower and main part of the room. dozerSep 27, 2011
0803060835ExtRearLeft.jpg
External from Left ReardozerSep 27, 2011
0802262149FRFromRearLi100_.jpg
Great Room from ReardozerSep 27, 2011
0802280808kitchenfrentry.jpg
Kitchen from Entry WayNotice the simple two level ceiling and the open design of the kitchen area, separated only by the wall color and floor tiles. 2 commentsdozerSep 27, 2011
0803010836GrRoomFromEntry.jpg
Great Room from the KitchenNotice how the glass blocks let in a lot of light.dozerSep 27, 2011
219 files on 19 page(s) 18

Debug Info 
Debug Output: show / hide