DSC03083.jpg
The floor tiling is complete. Now the only thing left to do is do a 10 centimeter tile border around the entire floor. (30-May-04)dozerSep 28, 2011
DSC03066.jpg
Kitchen floor tile. (26-May-04)dozerSep 28, 2011
DSC03062.jpg
Kitchen wall tile. Notice also the cabinet tile. (25-May-04)dozerSep 28, 2011
DSC03018.jpg
The house as it looks today. (19-May-04)dozerSep 28, 2011
DSC03017.jpg
The house as it looks today. (19-May-04)dozerSep 28, 2011
DSC02149.jpg
This shot shows a piece of tile being laid in. A straight line is used as a guide. Also the line is used to evaluate the level of the tile (so that any unevenness in the floor is taken care of). (14-May-04)dozerSep 28, 2011
DSC02137.jpg
This shot shows how the kitchen cabinets were formed. First off the counter is poured cement with a wire mesh cross support. This cross support is anchored in the wall. Then bricks are laid and finally the doors are placed. The doors are anchored into place with nails affixed to the side of the frame. (14-May-04)dozerSep 28, 2011
DSC02109.jpg
This shows the sheetrock roof in the main house area with prep holes for the down lights. (12-May-04)dozerSep 28, 2011
DSC02039.jpg
The repaired roof valley. This was kind of a struggle due to inadequate valley aluminum which was then compensated for by using two pieces which are welded together. In any event the valley now looks good and there is no problem with water leakage. (02-May-04)dozerSep 28, 2011
DSC01150.jpg
This shot shows the front facia board which can be made of either wood or synthetic. We are using synthetic version which is formed from cement. Also note the wood framing is being put in place to attach the outdoor roofing material (grc sheeting). (25-Apr-04)dozerSep 28, 2011
DSC01131.jpg
For each bathroom there are 2 septic tanks, dirty water and solid waste. Standard depth is 4 cement drainage rings, we use 5 which is better. This shot shows the solid waste septic on the left (servicing the small bathroom). The PVC which runs from the toilet is 4" in diameter. (22-Apr-04)dozerSep 28, 2011
DSC01056.jpg
Stucco is what gives strength to the wall. Notice the thickness of the stucco shown here. This is the front exterior wall. (17-Apr-04)dozerSep 28, 2011