|

Last additions - Original Coolthaihouse Build |

Opening being made for the circuit breaker. (12-May-04)dozerSep 28, 2011
|
|

The PVC is then cemented in place.dozerSep 28, 2011
|
|

A small outlet box being set in place. (02-Apr-04)dozerSep 28, 2011
|
|

PVC conduit is run up the wall to house the electrical. (22-Mar-04)dozerSep 28, 2011
|
|

Each of the septics are vented off to the rear as shown here. (21-Aug-04)dozerSep 28, 2011
|
|

Stainless septic exhaust cover installed. (09-Jul-04)dozerSep 28, 2011
|
|

Prep work for the septic exhaust cover. (08-Jul-04dozerSep 28, 2011
|
|

Large bathroom sink. This is one of those minor annoyances. This sink was placed a little too near the wall which means one needs to bend forward to use it.dozerSep 28, 2011
|
|

Large bathroom bathtub and toilet.dozerSep 28, 2011
|
|

Small bathroom sink.dozerSep 28, 2011
|
|

Completed small bathroom, toilet and shower enclosure. (06-Jul-04)dozerSep 28, 2011
|
|

Bathtub tiled in. (27-Jun-04)dozerSep 28, 2011
|
|
420 files on 35 page(s) |
 |
 |
 |
 |
 |
9 |  |
 |
 |
 |
|

|
|
|