happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > Original Coolthaihouse Section > Original Coolthaihouse Build

Last additions - Original Coolthaihouse Build
DSC02104.jpg
Opening being made for the circuit breaker. (12-May-04)dozerSep 28, 2011
DSC00160.jpg
The PVC is then cemented in place.dozerSep 28, 2011
DSC00158.jpg
A small outlet box being set in place. (02-Apr-04)dozerSep 28, 2011
DSC00114.jpg
PVC conduit is run up the wall to house the electrical. (22-Mar-04)dozerSep 28, 2011
DSC05144.jpg
Each of the septics are vented off to the rear as shown here. (21-Aug-04)dozerSep 28, 2011
DSC05038.jpg
Stainless septic exhaust cover installed. (09-Jul-04)dozerSep 28, 2011
DSC05035.jpg
Prep work for the septic exhaust cover. (08-Jul-04dozerSep 28, 2011
DSC05017.jpg
Large bathroom sink. This is one of those minor annoyances. This sink was placed a little too near the wall which means one needs to bend forward to use it.dozerSep 28, 2011
DSC05016~0.jpg
Large bathroom bathtub and toilet.dozerSep 28, 2011
DSC05015.jpg
Small bathroom sink.dozerSep 28, 2011
DSC05014.jpg
Completed small bathroom, toilet and shower enclosure. (06-Jul-04)dozerSep 28, 2011
DSC04129.jpg
Bathtub tiled in. (27-Jun-04)dozerSep 28, 2011
420 files on 35 page(s) 9

Debug Info 
Debug Output: show / hide