happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > Original Coolthaihouse Section > Original Coolthaihouse Build

Last additions - Original Coolthaihouse Build
DSC04035~1.jpg
The electrical systems feeds the 35 down lights and 5 fans hooked on the ceiling. (18-Jun-04)dozerSep 28, 2011
DSC03126.jpg
Under the patio runs this PVC which feeds the lighting on the wall and then runs to the pumps. (03-Jun-04)dozerSep 28, 2011
DSC03106.jpg
This is an after the fact picture - but shows where the ground is run to earth, just to the left of the PVC. This is the front of the driveway adjacent to the patio. The ground wire (grounding electrode conductor) is size 16, which runs to a piece of metal rod with is run into the ground 1.8 meters. The metal is 4 hun. Of significance, since surprisingly the electric department inspector wanted to know the specifics, as now apparently grounded electrical is required by the electric department. (02-Jun-04)dozerSep 28, 2011
DSC03094.jpg
The back of the back outside switch box. (31-May-04)dozerSep 28, 2011
DSC03071.jpg
And reset again. Notice now how the tabs are on the left and right side.dozerSep 28, 2011
DSC03068.jpg
So they need to get chipped out.dozerSep 28, 2011
DSC03067.jpg
Sadly the first electrical guy didn't really do too good a job. For example, here we discover the large socket outlet boxes are set in the wrong orientation. (26-May-04)dozerSep 28, 2011
DSC03041.jpg
Another shot of electrical PVC conduit. The switchbox mounted above the wall on the left really isn't necessary. It was installed by the first electrician.dozerSep 28, 2011
DSC03040.jpg
The entry switch box with 6 groups of wires. On the left is the electrical for a fan. (23-May-04)dozerSep 28, 2011
DSC03010~0.jpg
There is always a trio of wire, red is positive, white is negative and green is the ground.dozerSep 28, 2011
DSC02161.jpg
The electrician expounding on all things electrical. (18-May-04)dozerSep 28, 2011
DSC02108.jpg
A recessed lighting hole. The electrical wires which are housed in PVC conduit.dozerSep 28, 2011
420 files on 35 page(s) 8

Debug Info 
Debug Output: show / hide