Last additions - Original Coolthaihouse Build |
The stucco coat is thick as seen here, at least 1 centimeter thick. (17-Apr-04)dozerSep 27, 2011
|
|
Stucco being applied to the rear of the house. (09-Apr-04)dozerSep 27, 2011
|
|
The stucco is applied in coats. This is a rough coat. (02-Apr-04)dozerSep 27, 2011
|
|
The stucco being smoothed in the finishing coat.dozerSep 27, 2011
|
|
Completed rough wall section.dozerSep 27, 2011
|
|
The blocks are laid in rows with cement in-between. (28-Mar-04)dozerSep 27, 2011
|
|
Wall section - notice how there is a base above and below the window and red bricks are used to make the upper roof support. (28-Mar-04)dozerSep 27, 2011
|
|
Wall section in progress. (13-Mar-04)dozerSep 27, 2011
|
|
Shaping the driveway. (27-Jun-04)dozerSep 27, 2011
|
|
For outside surfaces that will not be tiled, they can be done is a semi-smooth, non slippery, finish. (04-Jun-04)dozerSep 27, 2011
|
|
A smoothing tool is used to correctly level and slope the patio. (03-Jun-04)dozerSep 27, 2011
|
|
Hand mixing concrete for the carport pour. (18-May-04)dozerSep 27, 2011
|
|