happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > Original Coolthaihouse Section > Original Coolthaihouse Build

Last additions - Original Coolthaihouse Build
DSC03132.jpg
Wall tile is laid much the same way. This example shows bathroom wall tile being set in place. The wall is scored and pure cement is for maximum adhesion. (03-Jun-04)dozerSep 27, 2011
DSC03057.jpg
Some places require small tile fragments to be laid to complete the area.dozerSep 27, 2011
DSC03051.jpg
After the cement is dry, tile grout is applied. The grouts come in various colors to match the shade of the tile. (24-May-04)dozerSep 27, 2011
DSC02149~0.jpg
Here the next tile is set in place. dozerSep 27, 2011
DSC02148.jpg
Each tile is carefully tapped into place. (14-May-04)dozerSep 27, 2011
DSC02117.jpg
Here is the front bedroom partially tiled. dozerSep 27, 2011
DSC02114.jpg
This shows a 'straight line' of clear nylon line which is used to make sure the rows are laid straight and also to make sure the tops of the tile are flat and at the proper level. dozerSep 27, 2011
DSC02112.jpg
Here a tile is being set in place.dozerSep 27, 2011
DSC02111.jpg
After the floor is poured a layer of cement is leveled in a row and tiles are placed on top of it and tapped into place. (13-May-04)dozerSep 27, 2011
DSC01153.jpg
The traces of underlying blocks will show until the cement dries. Before painting is a good time to examine the surface for cracks. (25-Apr-04)dozerSep 27, 2011
DSC01070.jpg
The foundation posts are finished off by having decorative corners added. (19-Apr-04)dozerSep 27, 2011
DSC01067.jpg
Stucco applied to the front of the house. (19-Apr-04)dozerSep 27, 2011
420 files on 35 page(s) 32

Debug Info 
Debug Output: show / hide