|
Last additions - Original Coolthaihouse Build |
More roof sections. This shot shows the covered parking area, and entryway areas. (22-Mar-04)dozerSep 27, 2011
|
|
This shot also shows the facia board (brand facolia, a synthetic material) along with an aluminum preformed strip for rain water. This drainage strip is inadequate in size and leads to problems later. It has a width of about 20 centimeters. (22-Mar-04) dozerSep 27, 2011
|
|
Partially finished roof truss, rear side of house. dozerSep 27, 2011
|
|
This shows most of the foundation columns as well as the partially finished roof truss. The roof height is 2.75 meters about the foundation pillars, the foundation pillars are 3.50 meters to the overall height is 6.25 meters. Being up on the roof truss is like mountain climbing.dozerSep 27, 2011
|
|
The roof tile will lie on the 1 by 1, so they must be placed at proper intervals. Notice the cross beam supports which sits on top of the foundation posts. dozerSep 27, 2011
|
|
The roof structure is built using heavy gauge steel. The bigger pieces are 4 * 2 inches 3.2 mm thick. The smaller pieces are 1 by 1inch 1.6 mm thick. There are two designations, full and light, this is the full heavier gauge variety. (13-Mar-04) dozerSep 27, 2011
|
|
The cement under the tile is used to bring the patio flooring to the desired level. (22-Jun-04)dozerSep 27, 2011
|
|
The finished indoor tile floor. (06-Jul-04)dozerSep 27, 2011
|
|
The cement under the tile is used to bring the patio flooring to the desired level. (22-Jun-04)dozerSep 27, 2011
|
|
Applying tiles to an outdoor patio. (21-Jun-04)dozerSep 27, 2011
|
|
Finishing off a detail section is a doorway.dozerSep 27, 2011
|
|
Here a border or 'skirt' is being laid out. The wall is scored to allow for maximum adhesion. The skirt should ideally be done before the wall has been painted. (14-Jun-04)dozerSep 27, 2011
|
|
420 files on 35 page(s) |
|
|
|
|
|
|
31 | |
|
|
|
|
|
|