|

Last additions - Original Coolthaihouse Build |

Gate section.dozerSep 28, 2011
|
|

Metal fencing section. (15-Aug-04)dozerSep 28, 2011
|
|

The gate and metal fencing in place. (13-Aug-04)dozerSep 28, 2011
|
|

The leaf and design details are finished off in an expensive gold paint (from Italy). There are two coats, a specialty yellow primer and then the gold leaf. (31-Jul-04)dozerSep 28, 2011
|
|

Roller mechanism for the gate. There is one metal roller on the outside and one on the inside of the upside down 'U' piece of metal. (29-Jul-04)dozerSep 28, 2011
|
|

Fitting a wall piece in place. (26-Jul-04)dozerSep 28, 2011
|
|

Fitting the gate in place. The metals are painted with a primer first and then painted with a quality oak shade of paint. (23-Jul-04)dozerSep 28, 2011
|
|

Metal being cut at the same time it is welded by another worker.dozerSep 28, 2011
|
|

In the gate is composed of 1 1/2 " square metal frame and vertical 1" square metal bars. The inside circular decorations were bought pre-finished, we use a butterfly and flower design. dozerSep 28, 2011
|
|

The gate track is laid in position. (15-Jul-04)dozerSep 28, 2011
|
|

Valve: The floats control the off/on position within the water tank. (19-Aug-04)dozerSep 28, 2011
|
|

end 5 Minutes Saved, the Story of DIRTY WATER!: Water is such a precious resource. How one short cut which saved the well digger 5 minutes of time could lead to such problems! Oh well, tit (this is Thailand). Now the water is clear as can be seen in this shot. (19-Aug-04) dozerSep 28, 2011
|
|
420 files on 35 page(s) |
 |
3 |  |
 |
 |
 |
 |
 |
 |
 |
|

|
|
|