This shows a relatively think layer of stucco is applied.dozerSep 28, 2011
|
|
Here stucco has been affixed.dozerSep 28, 2011
|
|
Each cabinet section has a wood door. dozerSep 28, 2011
|
|
A counter section after the red brick enclosure is complete. (14-May-04)dozerSep 28, 2011
|
|
Nails are used on the outside of the cabinet to anchor to the surrounding wall. dozerSep 28, 2011
|
|
Metal rebar (2 hun) is used in forming the brick column supports to add strength. A hole is drilled in the wall and the metal inserted.dozerSep 28, 2011
|
|
Partially finished counter with supporting brick columns.dozerSep 28, 2011
|
|
The counter will be supported by red brick columns. (13-May-04)dozerSep 28, 2011
|
|
The counter after the cement pour. (27-Apr-04)dozerSep 28, 2011
|
|
Pouring cement to form the counter.dozerSep 28, 2011
|
|
The red bricks designate where the sink will go. dozerSep 28, 2011
|
|
The metal for the kitchen counter is secured on top of some grc sheeting material and drilled into the wall prior to pouring cement. (26-Apr-04)dozerSep 28, 2011
|
|