|
Last additions - Original Coolthaihouse Build |
The wall exhaust fan looks like this. It is wired to a separate switch on the right hand side of the sink. (24-Aug-04)dozerSep 28, 2011
|
|
Finished cabinet section. The cabinet doors have been varnished with three coats of good quality wood varnish.dozerSep 28, 2011
|
|
Finished cabinet section with stainless sink installed. (06-Jul-04)dozerSep 28, 2011
|
|
Affixing grout to the tiles on the inside of the cabinets. (19-Jun-04)dozerSep 28, 2011
|
|
Affixing grout to the kitchen floor tiles. (27-May-04)dozerSep 28, 2011
|
|
Floor tiles. (26-May-04)dozerSep 28, 2011
|
|
Partial wall tile completed. dozerSep 28, 2011
|
|
The kitchen tile expert selecting tiles. (24-May-04)dozerSep 28, 2011
|
|
A bit of repair in process. The tile on the front of the cabinet was not even with the door, so the tiles are being removed. More cement will be added to adjust the level. (21-May-04)dozerSep 28, 2011
|
|
The cement surface of the cabinets is rough finished to allow the tiles to affix easily. dozerSep 28, 2011
|
|
This shows the opening formed for the exhaust fan. The opening is framed made from a wood frame cemented in place in the wall. The fan fits in place and can be slid out for cleaning. (18-May-04)dozerSep 28, 2011
|
|
This shows the rough finish on the stucco and the tiles being applied. Cement unmixed with sand is used as the affixing agent. (15-May-04)dozerSep 28, 2011
|
|
420 files on 35 page(s) |
|
|
|
|
|
13 | |
|
|
|
|
|
|
|