![Filename=DSC04043.jpg
Filesize=83KiB
Dimensions=640x480
Date added=Sep 28, 2011 DSC04043.jpg](albums/userpics/10002/thumb_DSC04043.jpg)
This shows the base for the shower enclosure in the small bathroom. Tile is being applied. (19-Jun-04)dozerSep 28, 2011
|
|
![Filename=DSC04021~0.jpg
Filesize=99KiB
Dimensions=640x480
Date added=Sep 28, 2011 DSC04021~0.jpg](albums/userpics/10002/thumb_DSC04021~0.jpg)
The plumber is applying tile grout. (14-Jun-04)dozerSep 28, 2011
|
|
![Filename=DSC04011.jpg
Filesize=88KiB
Dimensions=640x480
Date added=Sep 28, 2011 DSC04011.jpg](albums/userpics/10002/thumb_DSC04011.jpg)
Large bathroom after tiling is almost complete. The water runoff drain is on the far left (near the bathtub area). The bathtub still needs to be plumbed in. (12-Jun-04)dozerSep 28, 2011
|
|
![Filename=DSC04006.jpg
Filesize=88KiB
Dimensions=640x480
Date added=Sep 28, 2011 DSC04006.jpg](albums/userpics/10002/thumb_DSC04006.jpg)
Concrete walkway in the rear being finished off, showing two septic exhausts. Note also the metal brackets on the wall which are used as a support for the water heater which is a wall mount and resides in the kitchen.dozerSep 28, 2011
|
|
![Filename=DSC03166~0.jpg
Filesize=98KiB
Dimensions=640x480
Date added=Sep 28, 2011 DSC03166~0.jpg](albums/userpics/10002/thumb_DSC03166~0.jpg)
Concrete is poured over the hot and cold water pipes. Also note the septic exhaust. (07-Jun-04)dozerSep 28, 2011
|
|
![Filename=DSC03155.jpg
Filesize=97KiB
Dimensions=640x480
Date added=Sep 28, 2011 DSC03155.jpg](albums/userpics/10002/thumb_DSC03155.jpg)
Large bathroom after cement has just been poured. (05-Jun-04)dozerSep 28, 2011
|
|
![Filename=DSC03149.jpg
Filesize=116KiB
Dimensions=640x480
Date added=Sep 28, 2011 DSC03149.jpg](albums/userpics/10002/thumb_DSC03149.jpg)
Water runoff pipes run into the septic like this. (05-Jun-04)dozerSep 28, 2011
|
|
![Filename=DSC03124.jpg
Filesize=99KiB
Dimensions=640x480
Date added=Sep 28, 2011 DSC03124.jpg](albums/userpics/10002/thumb_DSC03124.jpg)
The large bathroom sink plumbing showing hot and cold water entry and the larger water exhaust pipe.dozerSep 28, 2011
|
|
![Filename=DSC03123.jpg
Filesize=94KiB
Dimensions=640x480
Date added=Sep 28, 2011 DSC03123.jpg](albums/userpics/10002/thumb_DSC03123.jpg)
Large bathroom plumbing layout. On the left is the general water runoff PVC. On the right is the water entry, bathtub exhaust, toilet exhaust and finally the sink exhaust pipe.dozerSep 28, 2011
|
|
![Filename=DSC03119.jpg
Filesize=81KiB
Dimensions=640x480
Date added=Sep 28, 2011 DSC03119.jpg](albums/userpics/10002/thumb_DSC03119.jpg)
Small bathroom after the cement pour. The 4" PVC on the left is the toilet exhaust and the 3" on the right is the shower stall exhaust. (03-Jun-04)dozerSep 28, 2011
|
|
![Filename=DSC03114.jpg
Filesize=115KiB
Dimensions=640x480
Date added=Sep 28, 2011 DSC03114.jpg](albums/userpics/10002/thumb_DSC03114.jpg)
The small bathroom being prepared for a cement pour. Sand has been leveled and the wire put in place. The bathroom will be sloped to allow the runoff water to flow to the floor drain.dozerSep 28, 2011
|
|
![Filename=DSC03112.jpg
Filesize=84KiB
Dimensions=640x480
Date added=Sep 28, 2011 DSC03112.jpg](albums/userpics/10002/thumb_DSC03112.jpg)
Small bathroom water entry for the toilet and bottom washer. The 4" PVC is the toilet exhaust. dozerSep 28, 2011
|
|
420 files on 35 page(s) |
![](images/spacer.gif) |
![](images/spacer.gif) |
![](images/spacer.gif) |
![](images/spacer.gif) |
![](images/spacer.gif) |
11 | ![](images/spacer.gif) |
![](images/spacer.gif) |
![](images/spacer.gif) |
![](images/spacer.gif) |
|
![](images/spacer.gif)
|
|
|