|
Last additions - Original Coolthaihouse Build |
This is the land plot after some fill dirt has been brought in (to the left of the truck). It is 84 square wah. (01-Jan-04) dozerSep 28, 2011
|
|
The resulting paving stone walkway. (12-Aug-04)dozerSep 28, 2011
|
|
The paving stones are set in place.dozerSep 28, 2011
|
|
Fine sand is leveled. (31-Jul-04)dozerSep 28, 2011
|
|
The front gutter system. (15-Aug-04)dozerSep 28, 2011
|
|
The rear gutter and down spout.(13-Aug-04)dozerSep 28, 2011
|
|
Added the final gutter on top of the patio. (19-Jul-04)dozerSep 28, 2011
|
|
Interconnected gutters. (09-Jul-04)dozerSep 28, 2011
|
|
Brackets.dozerSep 28, 2011
|
|
A completed gutter section.dozerSep 28, 2011
|
|
Installing brackets for the 6" gutter sections. (08-Jul-04)dozerSep 28, 2011
|
|
View of planter boxes from patio. (22-Aug-04)dozerSep 28, 2011
|
|
420 files on 35 page(s) |
1 |
|
|
|
|
|
|
|
|
|
|
|
|
|