happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > Original Coolthaihouse Section > Original Coolthaihouse Build

Last additions - Original Coolthaihouse Build
DSC00014.jpg
This is the land plot after some fill dirt has been brought in (to the left of the truck). It is 84 square wah. (01-Jan-04) dozerSep 28, 2011
DSC05115.jpg
The resulting paving stone walkway. (12-Aug-04)dozerSep 28, 2011
DSC05104.jpg
The paving stones are set in place.dozerSep 28, 2011
DSC05103.jpg
Fine sand is leveled. (31-Jul-04)dozerSep 28, 2011
DSC05125~1.jpg
The front gutter system. (15-Aug-04)dozerSep 28, 2011
DSC05121~0.jpg
The rear gutter and down spout.(13-Aug-04)dozerSep 28, 2011
DSC05080.jpg
Added the final gutter on top of the patio. (19-Jul-04)dozerSep 28, 2011
DSC05042.jpg
Interconnected gutters. (09-Jul-04)dozerSep 28, 2011
DSC05037~0.jpg
Brackets.dozerSep 28, 2011
DSC05036.jpg
A completed gutter section.dozerSep 28, 2011
DSC05029.jpg
Installing brackets for the 6" gutter sections. (08-Jul-04)dozerSep 28, 2011
DSC05151~0.jpg
View of planter boxes from patio. (22-Aug-04)dozerSep 28, 2011
420 files on 35 page(s) 1

Debug Info 
Debug Output: show / hide