happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > Renovations and Maintenance > CTH Maintenance

Last additions - CTH Maintenance
IMG_2881.jpg
Rerouted ElectricalSome electrical that ran encased in concrete prior needed to be re-routed. Add one to the reasons over time I don't like encasing anything in concrete. 1 commentsdozerSep 28, 2011
IMG_2875.jpg
Concrete RemovedAll of the old top concrete layer was busted out and removed.dozerSep 28, 2011
DSC01887.jpg
Original CrackThe original crack which was filled using wall putty a couple of time but kept re-appearing. dozerSep 28, 2011
DSCN0251.jpg
Finished WallThe finished wall a while later, crack has not re-appeared. dozerSep 28, 2011
IMG_3269.jpg
Rendered Prior to PaintdozerSep 28, 2011
IMG_3267.jpg
Render of Wire MeshdozerSep 28, 2011
IMG_3265.jpg
Mesh Affixed in Place and TrimmeddozerSep 28, 2011
IMG_3263.jpg
Applying the Wire Mesh ScreendozerSep 28, 2011
DSC05125.jpg
Original Front GateA kind of typical entry gate, ugly metal variety. This is after one of the neighbors dozed all the dirt out of the road (ergo the level of the road looks a little funny).dozerSep 28, 2011
DSCN0230p.jpg
Finished Gate and Entry DoorLike the look of the Stainless and the original iron sections surrounding it. Stainless only really is necessary for gates and door, things that move or open as it is really light.dozerSep 28, 2011
DSCN0233.jpg
Stainless GateThe completed stainless gate. One thing would do differently is be more careful to specific the distance between vertical pieces, it is a bit wide on the upper portion at 15 cm. dozerSep 28, 2011
IMG_3776.jpg
Drive Way RepairGrout is applied on either side of the track.
dozerSep 28, 2011
111 files on 10 page(s) 8

Debug Info 
Debug Output: show / hide