happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > Renovations and Maintenance > CTH Maintenance

Last additions - CTH Maintenance
IMG_2447.jpg
Ribs being Attached to FrameThe lateral support members are wired in place each 20 centimeters. dozerSep 28, 2011
IMG_2446.jpg
FormworkdozerSep 28, 2011
IMG_2444.jpg
Form Work and Rebar FrameThe form work is in place for the upper beam to be poured. The rebar frame for the beam is seem on the road. dozerSep 28, 2011
IMG_2438.jpg
ScrapThe part cut off, to be sold for scrap.dozerSep 28, 2011
IMG_2436.jpg
Metal ToppedThe top of the metal was cut off, here it is being smoothed. dozerSep 28, 2011
DSC05123.jpg
Original Wall with MetalAnother view of the original wall that will be raised. The metal will be topped and a new beam poured on top. dozerSep 28, 2011
DSC05120.jpg
Original View of Front WallThis is an original view of the front wall. To note the road had just been re-bulldozed, the lower total height of the wall is 75 cm and the top of the metal is at about 1.6 m. dozerSep 28, 2011
IMG_2891.jpg
Prep WorkThe top concrete layer had already been removed, here is some of the dirt dug in prep for pouring concrete. Forms are starting to be positioned. dozerSep 28, 2011
DSC05052.jpg
Original WellThe stone aggregate (used to line the line the well) footprint was eventually concreted over. dozerSep 28, 2011
IMG_2910.jpg
Troweling the SurfaceThe finished surface of the upper level of the pour with concrete all around the well. dozerSep 28, 2011
IMG_2892.jpg
Forming Sealing LayerThe forms and rebar are set in place to pour the upper level of concrete. The gutter is poured separately. dozerSep 28, 2011
IMG_2883.jpg
Forming GutterThe gutter will run along the exterior of the wall. Here rebar is placed to form the gutter. dozerSep 28, 2011
111 files on 10 page(s) 7