|
Last additions - CTH Maintenance |
Electric: New FanA new Regene fan is being installed in the study to replace an old fan that wasn't working. dozerSep 28, 2011
|
|
New OutletsNet Bticino face plate and outlets. dozerSep 28, 2011
|
|
Electric: Original funky outletsThese were the original funky outlets installed throughout the house. There is inadequate space to use all of the individual outlets. dozerSep 28, 2011
|
|
Garbage CollectionEven the really good workers will tend to just toss the garbage over the wall if you don't watch them. dozerSep 28, 2011
|
|
Ceiling Service EntryThe installer finishes around the service entry area. dozerSep 28, 2011
|
|
Installing DrywallThe drywall we used was the premium moisture resistant Chang brand. Here it is being screwed into the support structure. dozerSep 28, 2011
|
|
Prefab OpeningThis is a prefabricated opening from Chang. Even through it is made of sheetrock it is more durable and holds up better than the home made variety. dozerSep 28, 2011
|
|
Ceiling StructureNew ceiling structure put in place. The original ceiling was done wrong with wire supports as opposed to the aluminum strips and had other problems. dozerSep 28, 2011
|
|
Ceiling LineThe red line shows the new straight line for the ceiling. dozerSep 28, 2011
|
|
Ceiling ReplacementThe existing ceiling was removed and a new straight line established for the new ceiling. dozerSep 28, 2011
|
|
Window MaintenancePainting the sill. The windows were also re chalked, shaved, sanded and in general made like new. dozerSep 28, 2011
|
|
Finished SillShowing the finished painted sill. dozerSep 28, 2011
|
|
111 files on 10 page(s) |
|
3 | |
|
|
|
|
|
|
|
|
|