happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > Renovations and Maintenance > CTH Maintenance

Last additions - CTH Maintenance
IMG_3472.jpg
Electric: New FanA new Regene fan is being installed in the study to replace an old fan that wasn't working. dozerSep 28, 2011
IMG_3467.jpg
New OutletsNet Bticino face plate and outlets. dozerSep 28, 2011
IMG_3466.jpg
Electric: Original funky outletsThese were the original funky outlets installed throughout the house. There is inadequate space to use all of the individual outlets. dozerSep 28, 2011
IMG_3338.jpg
Garbage CollectionEven the really good workers will tend to just toss the garbage over the wall if you don't watch them. dozerSep 28, 2011
IMG_3335.jpg
Ceiling Service EntryThe installer finishes around the service entry area. dozerSep 28, 2011
IMG_3332.jpg
Installing DrywallThe drywall we used was the premium moisture resistant Chang brand. Here it is being screwed into the support structure. dozerSep 28, 2011
IMG_3331.jpg
Prefab OpeningThis is a prefabricated opening from Chang. Even through it is made of sheetrock it is more durable and holds up better than the home made variety. dozerSep 28, 2011
IMG_3330.jpg
Ceiling StructureNew ceiling structure put in place. The original ceiling was done wrong with wire supports as opposed to the aluminum strips and had other problems. dozerSep 28, 2011
IMG_3328.jpg
Ceiling LineThe red line shows the new straight line for the ceiling. dozerSep 28, 2011
IMG_3326.jpg
Ceiling ReplacementThe existing ceiling was removed and a new straight line established for the new ceiling. dozerSep 28, 2011
IMG_3322.jpg
Window MaintenancePainting the sill. The windows were also re chalked, shaved, sanded and in general made like new. dozerSep 28, 2011
IMG_3321.jpg
Finished SillShowing the finished painted sill. dozerSep 28, 2011
111 files on 10 page(s) 3

Debug Info 
Debug Output: show / hide