IMG_2594.jpg
Security Metal affixed to Top of WallThis security metal was fabricated here and then attached via anchor bolts. dozerSep 28, 2011
IMG_2567.jpg
Column LightingElectrician preparing to install the lighting on the top of each column. dozerSep 28, 2011
IMG_2547.jpg
Another ColumnElectric conduit extends through the top and has been taped. Note the new bricks used to top up the column are the nice decorative ones (3.5 b each) which look much nicer than the ones on the bottom. dozerSep 28, 2011
IMG_2534.jpg
Columns are RaisedThe Columns on either side of the Entry door and drive way gate are raised to match the neve level of the wall. Electric conduit extends through the top and has been taped. dozerSep 28, 2011
IMG_2518.jpg
Close up of the finished beamdozerSep 28, 2011
IMG_2517.jpg
Smoothing the Underside of the BeamdozerSep 28, 2011
IMG_2475.jpg
Edging the Upper BeamAfter the beam has set now it is being cornered. dozerSep 28, 2011
IMG_2451.jpg
Fabricating Security MetalThe security metal will be bolted on top of the finished wall. dozerSep 28, 2011
IMG_2450.jpg
Electric to Extrude through ColumnsThe level of the original electric will be raised since the columns is being extended upwards.dozerSep 28, 2011
IMG_2447.jpg
Ribs being Attached to FrameThe lateral support members are wired in place each 20 centimeters. dozerSep 28, 2011
IMG_2446.jpg
FormworkdozerSep 28, 2011
IMG_2444.jpg
Form Work and Rebar FrameThe form work is in place for the upper beam to be poured. The rebar frame for the beam is seem on the road. dozerSep 28, 2011