|
Last additions - Renovations and Maintenance |
Garbage CollectionEven the really good workers will tend to just toss the garbage over the wall if you don't watch them. dozerSep 28, 2011
|
|
Ceiling Service EntryThe installer finishes around the service entry area. dozerSep 28, 2011
|
|
Installing DrywallThe drywall we used was the premium moisture resistant Chang brand. Here it is being screwed into the support structure. dozerSep 28, 2011
|
|
Prefab OpeningThis is a prefabricated opening from Chang. Even through it is made of sheetrock it is more durable and holds up better than the home made variety. dozerSep 28, 2011
|
|
Ceiling StructureNew ceiling structure put in place. The original ceiling was done wrong with wire supports as opposed to the aluminum strips and had other problems. dozerSep 28, 2011
|
|
Ceiling LineThe red line shows the new straight line for the ceiling. dozerSep 28, 2011
|
|
Ceiling ReplacementThe existing ceiling was removed and a new straight line established for the new ceiling. dozerSep 28, 2011
|
|
Window MaintenancePainting the sill. The windows were also re chalked, shaved, sanded and in general made like new. dozerSep 28, 2011
|
|
Finished SillShowing the finished painted sill. dozerSep 28, 2011
|
|
Wood DoorsSeveral of the wood doors had swollen and needed to be shaved, some were re-hung and then a oil based paint (Glipton TOA) was used. Since they are not teak they look much better with a solid coat and it also help protects them. dozerSep 28, 2011
|
|
WindowsThe original wood windows didn't hold up too well. Was going to scrap them for aluminum when the wood guy said he could restore them no problem. dozerSep 28, 2011
|
|
Finished ViewClose up of the top beam edging. This group did good detailed work.dozerSep 28, 2011
|
|
192 files on 16 page(s) |
|
|
|
|
|
10 | |
|
|
|
|
|
|
|