happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > Original Coolthaihouse Section > Original Coolthaihouse Build > Details

Last additions - Details
DSC05012.jpg
Finished cabinet section with stainless sink installed. (06-Jul-04)dozerSep 28, 2011
DSC04045.jpg
Affixing grout to the tiles on the inside of the cabinets. (19-Jun-04)dozerSep 28, 2011
DSC03072.jpg
Affixing grout to the kitchen floor tiles. (27-May-04)dozerSep 28, 2011
DSC03066~0.jpg
Floor tiles. (26-May-04)dozerSep 28, 2011
DSC03055.jpg
Partial wall tile completed. dozerSep 28, 2011
DSC03049.jpg
The kitchen tile expert selecting tiles. (24-May-04)dozerSep 28, 2011
DSC03025.jpg
A bit of repair in process. The tile on the front of the cabinet was not even with the door, so the tiles are being removed. More cement will be added to adjust the level. (21-May-04)dozerSep 28, 2011
DSC02160.jpg
The cement surface of the cabinets is rough finished to allow the tiles to affix easily. dozerSep 28, 2011
DSC02159.jpg
This shows the opening formed for the exhaust fan. The opening is framed made from a wood frame cemented in place in the wall. The fan fits in place and can be slid out for cleaning. (18-May-04)dozerSep 28, 2011
DSC02152.jpg
This shows the rough finish on the stucco and the tiles being applied. Cement unmixed with sand is used as the affixing agent. (15-May-04)dozerSep 28, 2011
DSC02146.jpg
This shows a relatively think layer of stucco is applied.dozerSep 28, 2011
DSC02139.jpg
Here stucco has been affixed.dozerSep 28, 2011
122 files on 11 page(s) 7

Debug Info 
Debug Output: show / hide