happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > Original Coolthaihouse Section > Original Coolthaihouse Build > Details

Last additions - Details
DSC03109.jpg
Small bathroom hot and cold water for the shower stall.dozerSep 28, 2011
DSC03108.jpg
The hot water is run through copper enclosed in PVC pipe. (02-Jun-04)dozerSep 28, 2011
DSC03102.jpg
The PVC drainage from the small bathroom for the water runoff. There are 3 exhaust pipes used for each bathroom. One is for the bathtub (or shower stall), one is for the sink and one is for the outside drain. The pipes are secured in place with a heavy cement. (01-Jun-04)dozerSep 28, 2011
DSC03098.jpg
The 4" PVC is run into the toilet septic. The mallet is used to create the opening in the cement ring. (31-May-04)dozerSep 28, 2011
DSC01137.jpg
Here is a cement ring is being put in place in one of the septics. (23-Apr-04)dozerSep 28, 2011
DSC01132.jpg
The row of septics is dug behind the house. There are two groups of pairs of septics. From this side the sequence would be toilet, water runoff, water runoff, toilet. dozerSep 28, 2011
DSC01131~0.jpg
This shows the toilet septic for the small bathroom. In all there are 4 septic tanks, 2 for water runoff and 2 for toilets. There are 5 cement rings used for each one, the standard being 4. Each ring is 1.2 meters in diameter.dozerSep 28, 2011
DSC01130.jpg
A septic being dug. (22-Apr-04)dozerSep 28, 2011
DSC00103.jpg
The small bathroom with 4" PVC for the toilet.dozerSep 28, 2011
DSC00102.jpg
The framed small bathroom. (13-Mar-04)dozerSep 28, 2011
DSC05158.jpg
The wall exhaust fan looks like this. It is wired to a separate switch on the right hand side of the sink. (24-Aug-04)dozerSep 28, 2011
DSC05013.jpg
Finished cabinet section. The cabinet doors have been varnished with three coats of good quality wood varnish.dozerSep 28, 2011
122 files on 11 page(s) 6

Debug Info 
Debug Output: show / hide