|
Last additions - Details |
Large bathroom after tiling is almost complete. The water runoff drain is on the far left (near the bathtub area). The bathtub still needs to be plumbed in. (12-Jun-04)dozerSep 28, 2011
|
|
Concrete walkway in the rear being finished off, showing two septic exhausts. Note also the metal brackets on the wall which are used as a support for the water heater which is a wall mount and resides in the kitchen.dozerSep 28, 2011
|
|
Concrete is poured over the hot and cold water pipes. Also note the septic exhaust. (07-Jun-04)dozerSep 28, 2011
|
|
Large bathroom after cement has just been poured. (05-Jun-04)dozerSep 28, 2011
|
|
Water runoff pipes run into the septic like this. (05-Jun-04)dozerSep 28, 2011
|
|
The large bathroom sink plumbing showing hot and cold water entry and the larger water exhaust pipe.dozerSep 28, 2011
|
|
Large bathroom plumbing layout. On the left is the general water runoff PVC. On the right is the water entry, bathtub exhaust, toilet exhaust and finally the sink exhaust pipe.dozerSep 28, 2011
|
|
Small bathroom after the cement pour. The 4" PVC on the left is the toilet exhaust and the 3" on the right is the shower stall exhaust. (03-Jun-04)dozerSep 28, 2011
|
|
The small bathroom being prepared for a cement pour. Sand has been leveled and the wire put in place. The bathroom will be sloped to allow the runoff water to flow to the floor drain.dozerSep 28, 2011
|
|
Small bathroom water entry for the toilet and bottom washer. The 4" PVC is the toilet exhaust. dozerSep 28, 2011
|
|
This is the raw plumbing in the small bathroom, shown from the door opening counter clockwise. This shot shows the outside drain pipe (3" standing) along with the 2" sink runoff. The other PVC is the entry of hot and cold water.dozerSep 28, 2011
|
|
The small bathroom sink plumbing, showing hot and cold water entry and water runoff. dozerSep 28, 2011
|
|
122 files on 11 page(s) |
|
|
|
5 | |
|
|
|
|
|
|
|
|