|
Last additions - Details |
This is a critical piece of plumbing which is used under the bathtub. Without it, for one thing, foul smells can flow in through the bathtub from the water septic. (24-Jun-04)dozerSep 28, 2011
|
|
The plumber finishing off the shower enclosure.dozerSep 28, 2011
|
|
The top shows the heavy duty bathtub drain assembly which was purchased separately for about 1700 Baht. On lower portion shows the default drain assembly which comes with the bathtub. You wouldn't want to use this plastic type. (23-Jun-04)dozerSep 28, 2011
|
|
Partially tiled sink enclosure in the small bathroom. (22-Jun-04)dozerSep 28, 2011
|
|
The bathtub will be supported by this brick enclosure.dozerSep 28, 2011
|
|
The large bathroom cabinet. dozerSep 28, 2011
|
|
The 75 liter hot water heater which is mounted on the kitchen wall. This feeds hot water throughout the house.dozerSep 28, 2011
|
|
Cabinet in progress in the large bathroom. (21-Jun-04)dozerSep 28, 2011
|
|
The sink cabinet being formed in the small bathroom. The cabinet is made from bricks. Note the metal on the right which is used to add strength. Holes are drilled in the wall and the metal is inserted prior to the final cement being laid on top.dozerSep 28, 2011
|
|
Completed and tiled shower enclosure base. (20-Jun-04)dozerSep 28, 2011
|
|
This shows the base for the shower enclosure in the small bathroom. Tile is being applied. (19-Jun-04)dozerSep 28, 2011
|
|
The plumber is applying tile grout. (14-Jun-04)dozerSep 28, 2011
|
|
122 files on 11 page(s) |
|
|
4 | |
|
|
|
|
|
|
|
|
|