|

Last additions - Details |

A small outlet box being set in place. (02-Apr-04)dozerSep 28, 2011
|
|

PVC conduit is run up the wall to house the electrical. (22-Mar-04)dozerSep 28, 2011
|
|

Each of the septics are vented off to the rear as shown here. (21-Aug-04)dozerSep 28, 2011
|
|

Stainless septic exhaust cover installed. (09-Jul-04)dozerSep 28, 2011
|
|

Prep work for the septic exhaust cover. (08-Jul-04dozerSep 28, 2011
|
|

Large bathroom sink. This is one of those minor annoyances. This sink was placed a little too near the wall which means one needs to bend forward to use it.dozerSep 28, 2011
|
|

Large bathroom bathtub and toilet.dozerSep 28, 2011
|
|

Small bathroom sink.dozerSep 28, 2011
|
|

Completed small bathroom, toilet and shower enclosure. (06-Jul-04)dozerSep 28, 2011
|
|

Bathtub tiled in. (27-Jun-04)dozerSep 28, 2011
|
|

Bathtub in the process of being framed. The bathtub is being sized here. After this two more rows of supporting bricks were added, for a total of 4 supporting rows. (25-Jun-04)dozerSep 28, 2011
|
|

Heavy duty drainage assembly being attached to the bathtub. Note; this is a heavy duty acrylic bathtub.dozerSep 28, 2011
|
|
122 files on 11 page(s) |
 |
3 |  |
 |
 |
 |
 |
 |
 |
|

|
|
|