First Floor Columns completed with Formwork removedchiymanJan 18, 2011
|
|
Formwork for window lintel being constructedchiymanJan 18, 2011
|
|
Columns constructed and window lintel for full height windows in place. The formwork will be removed once the concrete has curedchiymanJan 18, 2011
|
|
|
Blockwork wall and bottom window lintel in placechiymanJan 18, 2011
|
|
Door lintel formwork being put in placechiymanJan 18, 2011
|
|
Blokwork wall with bottom window lintel steelwork being placedchiymanJan 18, 2011
|
|
First floor columns complete, roof ring beam being constructed from steel.The roof ring beam is commected to the top of the columns by welding to the reinforcement protrouding form the top of the column. An RC beam will also be constructed as a lintel for the large upstairs bedroom window - the formwork for this can be seen. I tried to make sure that safety on site was as good as possible but Thai people have their own way of doing things!! Fortunately he didnt fall off and indeed the whole project has been completed without any accident on site.
chiymanJan 18, 2011
|
|
Placing blockwork - note the steel reinforcement placed in the columns and embedded in the cement between each course of block.chiymanJan 18, 2011
|
|
Unloading Precast concrete slabschiymanJan 18, 2011
|
|
Pre Cast Concrete slabs being unloaded directly to the first floor beamschiymanJan 18, 2011
|
|
First Floor Concrete beams with partial removal of formwork ready for receiving the precast first floor slabs. I was very happy with the quality of the beams.chiymanJan 18, 2011
|
|