Last additions - chiyman's Gallery |
Steel waiting to be lifted into place for inclusion in the roofchiymanJan 18, 2011
|
|
A view from the farm landchiymanJan 18, 2011
|
|
Looks very skeletal but gives an idea of the overall height of the housechiymanJan 18, 2011
|
|
|
Platforms for construction of the roof which was very high - about 5m for eaves to top ridge. I wanted to have the roof as the mail recognisable feature of the house and was prepared to pay the additional cost for this.chiymanJan 18, 2011
|
|
Seems like a lot of steel in that roof. Shame they didnt follow my original design - would have saved about 25% of the steel required - what can one do when you are not there to supervise directly?chiymanJan 18, 2011
|
|
Another view or roof construction progresschiymanJan 18, 2011
|
|
The roof construction wee under way - required a lot of Yuca poles as scaffoldingchiymanJan 18, 2011
|
|
Supporting yuca poles for the roof constructionchiymanJan 18, 2011
|
|
Finishing the first floor slab concretechiymanJan 18, 2011
|
|
Finishing the concrete pour of the First Floor slab. All concrete was lifted by the bucket load to the first floor using the pully. At about 10kg a load the number of movements was considerable!!chiymanJan 18, 2011
|
|
Good quality hardwood doorframe squared and supported before blockwork constructionchiymanJan 18, 2011
|
|
160 files on 14 page(s) |
|
|
|
5 | |
|
|
|
|
|
|
|
|
|