staff ready to build thei accomodationthe staff bring their house to setup on the landMax&Bee-in-CMJun 17, 2010
|
|
muddy waterfirst water from 60 metre is very muddyMax&Bee-in-CMJun 17, 2010
|
|
|
clean waterwe have clean water, after a day of muddy waterMax&Bee-in-CMJun 17, 2010
|
|
main switchour electricity man installed the master switch on our poleMax&Bee-in-CMJun 17, 2010
|
|
electricity company installed the single phase meterstill deciding whether to get 3 phase power, the quote was for 68,000 baht, or to go ahead with single phase.Max&Bee-in-CMJun 17, 2010
|
|
drill truckarrives on site ready to drillMax&Bee-in-CMJun 17, 2010
|
|
heavy escavatorthe soil man needed to bring in a "big macro" to take out some stubborn tree stumps.Max&Bee-in-CMJun 17, 2010
|
|
drill trucklooks like prospecting for oil, but its not...Max&Bee-in-CMJun 17, 2010
|
|
drilling the holethe hole was drilled to 60 metres, at a cost of 36,000 baht.
it took about 3 days start to finish for the job.Max&Bee-in-CMJun 17, 2010
|
|
beaten up truckthats has got to be one of the most beaten up trucks i have ever seen.Max&Bee-in-CMJun 17, 2010
|
|
|