happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > User galleries > Max&Bee-in-CM

Last additions - Max&Bee-in-CM's Gallery
IMG_4608.JPG
All columns doneAll the foundations and columns have been poured and are drying.Max&Bee-in-CMJun 27, 2010
IMG_4616.JPG
DryingConcrete has been poured for foundations and columns, and is drying now.Max&Bee-in-CMJun 27, 2010
IMG_4623.JPG
Inside the rebar columnLooking down inside the rebar and the concrete column.Max&Bee-in-CMJun 27, 2010
IMG_4633.JPG
Soil colorsThe original soil is brown, and the infill soil is more yellow. Max&Bee-in-CMJun 27, 2010
IMG_4519.JPG
Making wooden stakesFor hunting vampires in the moo-bahnMax&Bee-in-CMJun 25, 2010
IMG_4520.JPG
The work siteMax&Bee-in-CMJun 25, 2010
IMG_4521.JPG
Metal shuttering for the columnsThe workers are sorting the shuttering delivered to site.Max&Bee-in-CMJun 25, 2010
IMG_4485.JPG
Maze of metalSwinging in the windMax&Bee-in-CMJun 25, 2010
IMG_4487.JPG
Column shutteringFixing the shuttering for the columns before concrete pour into the top.Max&Bee-in-CMJun 25, 2010
IMG_4488.JPG
Masked workerThe mystery worker works on the column shutteringMax&Bee-in-CMJun 25, 2010
IMG_4499.JPG
Columns alignedMax&Bee-in-CMJun 25, 2010
IMG_4503.JPG
Concrete floor for the bathroomThey put down some concrete to give a better floor for the outdoor bathroom. Fresh water is pumped up from 60 metres.Max&Bee-in-CMJun 25, 2010
307 files on 26 page(s) 16

Debug Info 
Debug Output: show / hide