|

Last additions - Max&Bee-in-CM's Gallery |

Front right boundary pegThis is the front right of the land, with the hole dug for the fence post. The electricity pole will be placed inside the fence.Max&Bee-in-CMJun 28, 2010
|
|

Bamboo fenceWe have chosen a bamboo fence. It is 3 m long and 2.5 m high. We have also ordered one that will not have gaps between the bamboo bars, hence have more privacy. Cost of each unit = 300 baht.Max&Bee-in-CMJun 28, 2010
|
|

Fence postsThese are the fence posts chosen, height is 3 m. Cost is 180 baht each. They are reinforced with 4 rebar, and have attachments for barbed wire.Max&Bee-in-CMJun 28, 2010
|
|

Front let boundary markerThis is the front of the land chanote tin-din boundary marker. The fence line has been marked from here to the rear.Max&Bee-in-CMJun 28, 2010
|
|

Back left boundary markerShown is the chanote tin-din land boundary marker located at the rear left of the land. A concrete post will be built, which will be significantly stronger than the purchased posts, to reinforce the fence.Max&Bee-in-CMJun 28, 2010
|
|

One of the post holesThe holes have been dug to a depth of 70 cm, the concrete posts are 3 m high.Max&Bee-in-CMJun 28, 2010
|
|

Holes along the backHoles for the fence posts have been dug along the back of the propertyMax&Bee-in-CMJun 28, 2010
|
|

Backfill in progressOur macro man is doing the backfillMax&Bee-in-CMJun 27, 2010
|
|
|

Backfill almost doneWe may need some soil trucks to finish the backfillMax&Bee-in-CMJun 27, 2010
|
|

Lots of waterThe front of the land got flooded, this shows clearly where the depressions in the land are.Max&Bee-in-CMJun 27, 2010
|
|

Foundations floodedHave to wait until it dries to continueMax&Bee-in-CMJun 27, 2010
|
|
307 files on 26 page(s) |
 |
 |
 |
 |
 |
14 |  |
 |
 |
 |
|

|
|
|