happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > Original Coolthaihouse Section > Original Coolthaihouse Build > Basics

Last additions - Basics
DSC00116.jpg
Starting to frame a bedroom door. A piece of 2 * 4 is used to keep the door in place.dozerSep 27, 2011
DSC00112.jpg
Front door of house framed. There is a cement base above the door frame. (22-Mar-04)dozerSep 27, 2011
DSC00104.jpg
Two windows framed. There is a 'leveled' cement base below the window frame and bricks are being used to level the wall to be even with the top of the frame. (13-Mar-04)dozerSep 27, 2011
DSC05121.jpg
Finished roof, view from rear.dozerSep 27, 2011
DSC05120~0.jpg
Finished roof, view from right front.dozerSep 27, 2011
DSC05119~0.jpg
Finished roof, view from right front.dozerSep 27, 2011
DSC04155.jpg
This is the final fix to the valley on the right side of the house. Added flashing material is being added. (30-Jun-04)dozerSep 27, 2011
DSC02155.jpg
For comparisons sake, a pair of photos of another house, which shows a wide strip of aluminum flashing (about 1 meter wide) being used which is a better way to do the roof flashing. (15-May-04/09-May-04)dozerSep 27, 2011
DSC02090.jpg
Patio roof section along in foreground. (10-May-04)dozerSep 27, 2011
DSC02083.jpg
Plastic inserts like these come in easy to install strips, each piece covering 3 sections (like the one shown). The are used to prevent birds and rodents from entering the attic area. (09-May-04)dozerSep 27, 2011
DSC02081.jpg
For comparisons sake, a pair of photos of another house, which shows a wide strip of aluminum flashing (about 1 meter wide) being used which is a better way to do the roof flashing. (15-May-04/09-May-04)dozerSep 27, 2011
DSC02079.jpg
A supplemental support beam was added to the roof section over the driveway. (08-May-04)dozerSep 27, 2011
133 files on 12 page(s) 4

Debug Info 
Debug Output: show / hide