3 Feb 2009Some of the floor panels are now in place in the back area of the house.pklongballFeb 03, 2009
|
|
29 Jan. 2009So here we are at the end of day on the 29th. Insect system installed and 10 columns poured along with the delivery of the floor panels. All in all a good week of progress on the Phala House. Stay tuned for more.pklongballJan 31, 2009
|
|
29 Jan. 2009Overview of Mr. Termite spraying the ground under the house. This first application of termite chemical will be followed with another using the tubing system just after house completion and then every six months after. The current contract is for 3 years.pklongballJan 31, 2009
|
|
29 Jan. 2009Just another view of the final result of the tubing install and some debris that will be removed before the floor goes in placepklongballJan 31, 2009
|
|
29 Jan. 2009View just after the install of the tubing. A first application of the chemical was applied using a high pressure sprayer.pklongballJan 31, 2009
|
|
29 Jan. 2009The install called for the Termite Team to install 10 zones of tubing. The zones were divided into 4 exit points around the foundation. If these look long , they are intending to be cut to a proper length when the final finish is applied to the wall.pklongballJan 31, 2009
|
|
29 Jan. 2009This view shows the newly added black tubing that is part of a termite control system. Installed today.pklongballJan 31, 2009
|
|
29 Jan. 2009Overview of the site just after the first delivery of floor panels.pklongballJan 31, 2009
|
|
29 Jan. 2009The crew is taking a short break waiting for the next batch of concrete from the mixer.pklongballJan 31, 2009
|
|
29 Jan. 2009This view shows the floor panels near the back of the house and the crew busy filling the first 10 of the columns.pklongballJan 31, 2009
|
|
29 Jan. 2009The floor panels were delivered today. We have 3 different lengths to span the areas needed.pklongballJan 31, 2009
|
|
|