Last additions - pklongball's Gallery |
28 AprilThese two water men are installing the cold supply lines. White shirt is the bossmanpklongballMay 02, 2009
|
|
28 AprilThe start of installing the drain lines in one bathroompklongballMay 02, 2009
|
|
28 AprilThe labor crew hand dug this trench around the property perimeter from the septic tank. A series of pipe and boxes will be installed to drain the run out from the septic tank as well as the grey water from the showers and sinks and any water from rain on the land. Ends in the street sewer drainage system.pklongballMay 02, 2009
|
|
28 AprilOne 1600 liter tank for the two toilets should do the trick.pklongballMay 02, 2009
|
|
28 AprilNo real explanation here as this is a partially complete drain from the toilets.pklongballMay 02, 2009
|
|
28 AprilAt the same time as the ceiling crew arrived the waterman finally made a return and started his part of the job. Here we can see the now installed toilet pipes and the beginning of the shower and sinks drain linespklongballMay 02, 2009
|
|
28 AprilWe have some work starting on the gypsum ceiling. The crew came in today and started outside.pklongballMay 02, 2009
|
|
21 AprilThis is the view most visitors to the area will see when coming from the main entry of the projectpklongballApr 23, 2009
|
|
21 AprilBack view of the place as of todaypklongballApr 23, 2009
|
|
21 AprilNow some work has started on the back veranda stairway. A base layer of concrete was poured today.pklongballApr 23, 2009
|
|
21 AprilHere we have a gable now with all the Sherawood applied. The yellow color is the Shera unfinished out of the box color. We will paint it and the trim wood will get finish too.pklongballApr 23, 2009
|
|
18 AprilWhat else but another view of the gables. I guess some may think I'm obsessed with this but it cost a lot to build this roof and gables versus the traditional hip roof. A lot!pklongballApr 18, 2009
|
|
838 files on 70 page(s) |
|
|
|
|
|
44 | |
|
|
|
|
|
|
|