happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > User galleries > pklongball

Last additions - pklongball's Gallery
P4292077.JPG
29 AprilThe sewer drain trench along one side of the land.pklongballMay 02, 2009
P4292061.JPG
29 AprilGuest bath rough-in for the sink and location of the water heater.pklongballMay 02, 2009
P4292063.JPG
29 AprilHere we see the one added personal touch we have in the master bath. We will have 2 sets of mixer valves. The one to the right in the photo is a normal mixer valve location with a rain shower head and hand held sprayer. The 2nd one on the left is another mixer and hand-held location down lower on the side wall and near where a sit down bench will be built. This will be nice for those days when you really want to scrub the feet or when I get too old to stand under the rain head. pklongballMay 02, 2009
P4292065.JPG
29 AprilMaster bath plumbing is now roughed-in. Minimal pipes in the floorpklongballMay 02, 2009
P4292068.JPG
29 AprilMore ceiling grid in preparation for the sheetrockpklongballMay 02, 2009
P4292067.jpg
29 AprilThe now installed front door frame and the finished wall area. Should look nice when the glass and doors are in place and finished.pklongballMay 02, 2009
P4282055.JPG
28 AprilDifferent view of the septic tank and some of the early pipe work. You can also see the trench that will have a pipe to carry the grey water and septic water away.pklongballMay 02, 2009
P4282056.jpg
28 AprilJust another view of the workers and how they do it.pklongballMay 02, 2009
P4282059.JPG
28 AprilA look under the ceiling to see the metal gridwork for the "green" board that will be installed later.pklongballMay 02, 2009
P4282048.JPG
28 AprilTwo of the ceiling crew hanging the metal gridwork for the back veranda ceiling.pklongballMay 02, 2009
P4282049.JPG
28 AprilA look at some of the metal stringers and grid used to prepare for the gypsum ceiling around the eaves.pklongballMay 02, 2009
P4282050.JPG
28 AprilHere we see and assortment of supply and drains. The open wall cavity allows them to put in both bathrooms at the same time. Only a minimal amount of pipes are buried in the floor tile.pklongballMay 02, 2009
838 files on 70 page(s) 43

Debug Info 
Debug Output: show / hide