5 MayThe ceiling boys were in today and they go more "rock" installed. Here we can see a square hole that will be a service access to the attic space.pklongballMay 05, 2009
|
|
2 MayI think I posted this photo once but just in case here again is the septic tank and the drain pipes from the housepklongballMay 02, 2009
|
|
2 MayAnother angle of the back stepspklongballMay 02, 2009
|
|
2 MayI popped the cover so you can see how simple a device this "grease"trap is. But it IS a necessity to contain the "stuff" wifey washes down the drain. Edit here: Can anyone tell me if the metal strainer basket is installed correctly? I think it looks backasswards.pklongballMay 02, 2009
|
|
2 MayA view looking along the back wall and the partly buried drain pipes and boxes.pklongballMay 02, 2009
|
|
2 MayA view from the back looking at the now partially complete back veranda steps. Should look good whn he's done and the tile and sandwash are in place.pklongballMay 02, 2009
|
|
2 MayWe see the stair man working on the second of 3 steps up/down from the back veranda. pklongballMay 02, 2009
|
|
29 AprilMore of the pipes as they come to the yet to be installed sewer pipe.pklongballMay 02, 2009
|
|
29 AprilAs the pipes exit the opening going to the septic and drain pipes. PLEASE NOTE THE U_TRAP NEAR THE OPENING! There are two of these on the shower floor/sink drain lines from each bath roompklongballMay 02, 2009
|
|
29 AprilNow a view from the crawl space opening and we can see the finished rough in for the bath pipingpklongballMay 02, 2009
|
|
29 AprilHere we have the stairman working on the back veranda stairway. First was a concrete pad. Now the first course of brick to build the first step.pklongballMay 02, 2009
|
|