8 MayHere we have Sparky number 2 getting a length of flex conduit ready for install.pklongballMay 08, 2009
|
|
8 MayMore distant view of some of the myriad of wire being strung in the conduit and this will find its way down into the load centerpklongballMay 08, 2009
|
|
8 MayThe beginning of the final wiring for the load centerpklongballMay 08, 2009
|
|
8 MayDelivery man checking the boxes of tilepklongballMay 08, 2009
|
|
8 MayDelivery man checking the boxes of tilepklongballMay 08, 2009
|
|
8 MayToday we had a delivery of the tile for the main bath, main floors and front balcony. We have Mrs PK and the delivery man checking the quantity and type of tile delivered. She has been a great manager for our team.pklongballMay 08, 2009
|
|
8 MayToday we had a delivery of the tile for the main bath, main floors and front balcony.pklongballMay 08, 2009
|
|
8 MayHere is a new thing. Wife decided she wanted a recessed area in the wall above the bed headboard to put items such as books, flowers , knick-knacks or whatever. So we had the crew saw cut out the area and this will be finished off in some nice way.pklongballMay 08, 2009
|
|
5 MayA view looking at the living room ceiling area and gridwork and some drywall.pklongballMay 05, 2009
|
|
5 MayThe septic tank is now half buried and the newly dug trench from the street comes to the drain box. I need to get them to be sure that no water from any drain line in the house can drain to the back of the land so some sort of blocking will have to be placed in the pipe thats heads and slopes to the back.pklongballMay 05, 2009
|
|
5 MayToday they finished the second trench down the side from the septic tank to the street drain. I hope tomorrow the pipe will be installed.pklongballMay 05, 2009
|
|
5 MayAnother view from under the veranda ceilingpklongballMay 05, 2009
|
|