20 MayThe now finished ceiling just before the primer and main paintingpklongballMay 23, 2009
|
|
20 MayTwo of the paint crew. These folks are sanding smooth the walls after an application of a skim coat to the rendered walls. This is the final sanding before painting.pklongballMay 23, 2009
|
|
20 MayBack of the house looking at the master bedroom door and the now painted walls. First coat is a primer coatpklongballMay 23, 2009
|
|
20 MayAnother angle of the tile in the bedroompklongballMay 23, 2009
|
|
20 MayNow we have floor tile in the master bedroom. This tile has a simulated woodgrain look.pklongballMay 23, 2009
|
|
21 MayAnother view of Sparky the pole jockey. I don't know if you can see the heavy rope he has used around his waist and around the pole as a safety. pklongballMay 22, 2009
|
|
21 MayThis is a view that you don't see every day. Sparky is up on our pole and he is adding some steel brackets and U bolts to secure the PVC and the PE pipe to the pole. He asked me if I wanted this and I of course said yes. This type of thing will also be used under the house in the crawl space where the PE comes up from the trench and goes to the load center conduit under the floor.pklongballMay 22, 2009
|
|
20 MayHere we can see the finished PE pipe that has 2 phone cables. One will be active and the second a backup pair.pklongballMay 20, 2009
|
|
20 MayI wanted to show the stubbed up end of the third PE pipe that Sparky ran. This pipe will have the poweer for the wall lighting and automatic gate opener.pklongballMay 20, 2009
|
|
20 MayThis is one of the paint crew and he was painting the wood trim with a primerpklongballMay 20, 2009
|
|
20 MayToday we have a view of the back of the place and we have a new coat of white primer paint to seepklongballMay 20, 2009
|
|
19 MayAnother view of the two cable feeders. Before the needed length was pulled in , tile man 1 went under the house to help pull. So we ended up with 3 pulling and one feeding. But in about 20 minutes or so it was done.pklongballMay 19, 2009
|
|