|
Last additions |
|
|
|
|
|
|
![Filename=nearly_finished.jpg
Filesize=85KiB
Dimensions=640x282
Date added=Mar 25, 2007 nearly_finished.jpg](albums/userpics/10489/thumb_nearly_finished.jpg)
Nearly finished!Well, at least outside. Inside, all the floor tiles still need to be laid, the bathrooms installed and the electrics completed.jazzmanMar 25, 2007
|
|
|
|
![Filename=3-20-07_003.jpg
Filesize=147KiB
Dimensions=640x480
Date added=Mar 20, 2007 3-20-07_003.jpg](albums/userpics/10061/thumb_3-20-07_003.jpg)
split level GlennMar 20, 2007
|
|
|
![Filename=Floor_drains.jpg
Filesize=66KiB
Dimensions=320x240
Date added=Mar 20, 2007 Floor_drains.jpg](albums/userpics/10489/thumb_Floor_drains.jpg)
Floor drainsThe drains in the the bathrooms and on the terraces were protected with PVC film and screwed into their pipes to serve as further height guages. Their height will be adjusted again later to be flush with the tiles. These diecast drains cost 140 baht but turned out to be not very good so we got the much more expensive one in the next picture instead.jazzmanMar 20, 2007
|
|
7141 files on 596 page(s) |
![](images/spacer.gif) |
![](images/spacer.gif) |
![](images/spacer.gif) |
![](images/spacer.gif) |
![](images/spacer.gif) |
576 | ![](images/spacer.gif) |
![](images/spacer.gif) |
![](images/spacer.gif) |
![](images/spacer.gif) |
|
![](images/spacer.gif)
|
|
|