Nearly finished!Well, at least outside. Inside, all the floor tiles still need to be laid, the bathrooms installed and the electrics completed.jazzmanMar 25, 2007
|
|
|
|
split level GlennMar 20, 2007
|
|
|
Floor drainsThe drains in the the bathrooms and on the terraces were protected with PVC film and screwed into their pipes to serve as further height guages. Their height will be adjusted again later to be flush with the tiles. These diecast drains cost 140 baht but turned out to be not very good so we got the much more expensive one in the next picture instead.jazzmanMar 20, 2007
|
|