happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Last additions
071117FRFromRearLi100a.jpg
Great room from rearMsDozerDec 12, 2007
0711152137KitFromEnti100__.jpg
Kitchen from entry wayMsDozerDec 12, 2007
0711160107BRShSidei95a.jpg
Bathroom from shower sideMsDozerDec 12, 2007
0711171235BathRPanLi85a.jpg
Bathroom pan viewMsDozerDec 12, 2007
IM000569a.jpg
Shower wall of glass blocksThis is taken from our bedroom doorway looking through the closet into the bathroom. somdetNov 30, 2007
IM000572.jpg
rendering the wallAfter taking an 8 day break, they did almost the entire wall in one day ( about 130 meters).somdetNov 30, 2007
IM000568.jpg
roof tilesThese are CPAC Monier Zeason tiles. The color is Winter Gray. They cost 18 baht a piece. The apparent difference in size is just an optical illusion created by the height of the stacks of tiles.somdetNov 30, 2007
IM000567.jpg
Getting thereAbout 90% of the shell is done. Next steps are tiles, plumbing and painting.somdetNov 30, 2007
outdoor_livingroom_.JPG
Br,fast.And here Tintin is enjoying breakfast. (dry white bread with strawberry jam from the local 7/11 to calm an upsett stomach) tintinNov 09, 2007
Badekar_.jpg
Home in Pattaya.Master bathroom with concrete bathtub. Strangely the tub always look dirty in pictures.tintinNov 07, 2007
Bassengpumpe_.jpg
Home in Pattaya.Poolpump, filters etc. before it was built in. tintinNov 07, 2007
ogs__sett_fra_gaten_189.jpg
Home in Pattaya.The house seen from the road. Or the gate where the poolboy used to ring the doorbell insanely early every morning before he was sacked, since the house is almost not visible.tintinNov 07, 2007
7141 files on 596 page(s) 546

Debug Info 
Debug Output: show / hide