happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Last additions
DSC02173_-_Floor_Slabs_-_010908.JPG
Floor slabs being laid in place.Rick BFeb 06, 2008
DSC02175_-_Floor_Slabs_-_010908.JPG
Floor slabs (pan peun) are being laid for the first floor. These slabs will be covered with wire mesh and an additional 5cm of poured concrete.Rick BFeb 06, 2008
DSC02177_-_2nd_Floor_Beams_-_012108.JPG
Rebar and forms for the second floor beams are bing assembled.Rick BFeb 06, 2008
DSC02148_-_FIrst_Floor_Columns_-_122807.JPG
First floor columns' forms are being assembled after the floor beams were completed.Rick BFeb 06, 2008
DSC02151_-_First_Floor_Columns_-_122807.JPG
First floor columns are being fitted with formsRick BFeb 06, 2008
DSC02154_-_First_Floor_Foundations_-_010808.JPG
First floor beams are ready for the floor slabs (pan peun)Rick BFeb 06, 2008
DSC02160_-_Floor_Sabs_-_010808.JPG
Pre-stressed floor slabs for the first floor are being delivered direct from the factoryRick BFeb 06, 2008
DSC02094_-_First_Floor_Foundations_-_121507.JPG
Rebar for the first floor beams is being assembled in place.Rick BFeb 06, 2008
DSC02117_-_First_Floor_Foundation_-_122107.JPG
Forms and rebar for the first floor beams are ready for the concrete pour.Rick BFeb 06, 2008
DSC02112_-_First_Floor_Foundations_-_122107.JPG
Forms for the first floor beams are being assembled.Rick BFeb 06, 2008
DSC02118_-_First_Floor_Foundation_-_122107.JPG
Rebar and forms for the first floor beams are ready for the concrete pour. The top of the first floor is 115cm above grade to minimize problems should there ever be flooding.Rick BFeb 06, 2008
DSC02038_-_Footer_and_Column_Rebar_Cages_-_112207.JPG
A typical footer and column placed on top of a single pile.Rick BFeb 06, 2008
7141 files on 596 page(s) 528

Debug Info 
Debug Output: show / hide