29 AprilAs the pipes exit the opening going to the septic and drain pipes. PLEASE NOTE THE U_TRAP NEAR THE OPENING! There are two of these on the shower floor/sink drain lines from each bath roompklongballMay 02, 2009
P4292073.JPG
29 AprilNow a view from the crawl space opening and we can see the finished rough in for the bath pipingpklongballMay 02, 2009
P4292075.JPG
29 AprilHere we have the stairman working on the back veranda stairway. First was a concrete pad. Now the first course of brick to build the first step.pklongballMay 02, 2009
P4292077.JPG
29 AprilThe sewer drain trench along one side of the land.pklongballMay 02, 2009
P4292061.JPG
29 AprilGuest bath rough-in for the sink and location of the water heater.pklongballMay 02, 2009
P4292063.JPG
29 AprilHere we see the one added personal touch we have in the master bath. We will have 2 sets of mixer valves. The one to the right in the photo is a normal mixer valve location with a rain shower head and hand held sprayer. The 2nd one on the left is another mixer and hand-held location down lower on the side wall and near where a sit down bench will be built. This will be nice for those days when you really want to scrub the feet or when I get too old to stand under the rain head. pklongballMay 02, 2009
P4292065.JPG
29 AprilMaster bath plumbing is now roughed-in. Minimal pipes in the floorpklongballMay 02, 2009
P4292068.JPG
29 AprilMore ceiling grid in preparation for the sheetrockpklongballMay 02, 2009
P4292067.jpg
29 AprilThe now installed front door frame and the finished wall area. Should look nice when the glass and doors are in place and finished.pklongballMay 02, 2009
P4282055.JPG
28 AprilDifferent view of the septic tank and some of the early pipe work. You can also see the trench that will have a pipe to carry the grey water and septic water away.pklongballMay 02, 2009
P4282056.jpg
28 AprilJust another view of the workers and how they do it.pklongballMay 02, 2009
P4282059.JPG
28 AprilA look under the ceiling to see the metal gridwork for the "green" board that will be installed later.pklongballMay 02, 2009