 Coolthaihouse Photo Gallery

Construction Photos
Last additions
P5052173.JPG
5 MayThe septic tank is now half buried and the newly dug trench from the street comes to the drain box. I need to get them to be sure that no water from any drain line in the house can drain to the back of the land so some sort of blocking will have to be placed in the pipe thats heads and slopes to the back.pklongballMay 05, 2009
P5052174.JPG
5 MayToday they finished the second trench down the side from the septic tank to the street drain. I hope tomorrow the pipe will be installed.pklongballMay 05, 2009
P5052167.JPG
5 MayAnother view from under the veranda ceilingpklongballMay 05, 2009
P5052168.JPG
5 MayMore of the ceiling work around the back veranda areapklongballMay 05, 2009
P5052169.JPG
5 MayMore of the ceiling work around the back veranda areapklongballMay 05, 2009
P5052170.JPG
5 MayHere we have some of the completed work around the exterior soffits or eaves. Later we will add some ventilation ports.pklongballMay 05, 2009
P5052171.JPG
5 MayView of the kitchen ceiling gridpklongballMay 05, 2009
P5052162.JPG
5 MayHere we have one of the 2 half walls that will create the wet and dry areas for the master bath shower and toilet. This was just built in the last day or so.pklongballMay 05, 2009
P5052163.JPG
5 MayMaster bedroom ceiling and some of the electric pipes and boxespklongballMay 05, 2009
P5052164.JPG
5 MayAnother view of the newly pulled wire for the bedroom down lights and fanpklongballMay 05, 2009
P5052165.JPG
5 MayNot sure if you can pick it up in this view but I am trying to show some electrical conduit and now wires for the ceiling drop lights and the fan. Sparky was here today before the ceiling gets closed up on him.pklongballMay 05, 2009
P5052166.JPG
5 MayHere we have a view of the living room ceiling and the partly installed rock. This look is back towards the front door.pklongballMay 05, 2009
7141 files on 596 page(s) 455