|
Last additions |

2 JuneThe ladies get the job of tieing all the steel to the rebar to form the cagepklongballJun 02, 2009
|
|

2 JuneA little closer look at the junction of the beam rebar to the upright columnspklongballJun 02, 2009
|
|
|

a veiw down the right side of the house from the reargeordieJun 02, 2009
|
|

halfway down the right side showing kitchen door window geordieJun 02, 2009
|
|

one corner of living room showing door to m in law bedroom drop in ceiling is old house abovegeordieJun 02, 2009
|
|

front of house being tiled window looks pi---d in photo only geordieJun 02, 2009
|
|

the last meal with buildersgeordieJun 02, 2009
|
|
|

that wall use to be two meters high the drain is grey water with a 4" pipe through to the road for monsoon drainage on both sides of the housegeordieJun 02, 2009
|
|

two rear bedrooms showing clearly the old house still in situgeordieJun 02, 2009
|
|

praparing the last mealgeordieJun 02, 2009
|
|
7141 files on 596 page(s) |
 |
 |
 |
 |
 |
442 |  |
 |
 |
 |
|

|
|
|