June 12Now the second bath floor is almost finished. Just some grout work to do.pklongballJun 12, 2009
|
|
June 12Another inside view of the second bath and the floor and now partially built vanity for the sink.pklongballJun 12, 2009
|
|
June 12The tile man is laying some tile at the master bedroom door . The window crew is coming o install the fram and this needs to be done todaypklongballJun 12, 2009
|
|
June 12The wall man is adding the finish to the now completed column in the backpklongballJun 12, 2009
|
|
June 8I will not say I was reaching for the moon here just giving a perspective as to how high the ceiling is in relation to my six feet plus outstreched armpklongballJun 12, 2009
|
|
June 8One of the built-in crew do some wood workingpklongballJun 12, 2009
|
|
June 8This guy stood on this ladder like this for at least 20 minutes trying to snake an electric cable down behind the cabinet to the place where a lite will be locatedpklongballJun 12, 2009
|
|
June 10Work has moved to the point of the almost finished look for the window. These panels will be a double bi-fold to each side to allow the opening.pklongballJun 12, 2009
|
|
June 10All the base and wall units are installed now and the work moves to finishing the doors and suchpklongballJun 12, 2009
|
|
June 7More of the crew adding the sand wash to the rear stepspklongballJun 12, 2009
|
|
June 7A different angle but the same day and more of the same sand wash stepspklongballJun 12, 2009
|
|
June 7The cabinet folks are also adding the finishing touches to the pass through window in the kitchen. pklongballJun 12, 2009
|
|