June 12Here we have the old man of the crew. He is 72 and still going strong. He does most of the finish wood work for Apple our builder. Anything wood that goes in to the house such as doors, millwork etc. He saw our kitchen window trim out and complimented the cabinets folks work. Here he is doing the finish cutting to fit one of the bedroom doorspklongballJun 12, 2009
|
|

June 12Now the second bath floor is almost finished. Just some grout work to do.pklongballJun 12, 2009
|
|

June 12Another inside view of the second bath and the floor and now partially built vanity for the sink.pklongballJun 12, 2009
|
|

June 12The tile man is laying some tile at the master bedroom door . The window crew is coming o install the fram and this needs to be done todaypklongballJun 12, 2009
|
|

June 12The wall man is adding the finish to the now completed column in the backpklongballJun 12, 2009
|
|

June 8I will not say I was reaching for the moon here just giving a perspective as to how high the ceiling is in relation to my six feet plus outstreched armpklongballJun 12, 2009
|
|

June 8One of the built-in crew do some wood workingpklongballJun 12, 2009
|
|

June 8This guy stood on this ladder like this for at least 20 minutes trying to snake an electric cable down behind the cabinet to the place where a lite will be locatedpklongballJun 12, 2009
|
|

June 10Work has moved to the point of the almost finished look for the window. These panels will be a double bi-fold to each side to allow the opening.pklongballJun 12, 2009
|
|

June 10All the base and wall units are installed now and the work moves to finishing the doors and suchpklongballJun 12, 2009
|
|

June 7More of the crew adding the sand wash to the rear stepspklongballJun 12, 2009
|
|

June 7A different angle but the same day and more of the same sand wash stepspklongballJun 12, 2009
|
|