June 14Another tileman is using the water cutter to cut the granite for the vanity backsplashpklongballJun 14, 2009
|
|
June 14Same man different view. This water cooled cut is done with a small tube and siphoned water from a bucketpklongballJun 14, 2009
|
|
June 14The wood work team hard at it installing another deck railing near the master bedroom doorpklongballJun 14, 2009
|
|
June 14The roof structure is almost complete and now the floor can be poured and the roof tile installedpklongballJun 14, 2009
|
|
June 14Underside view of the new stainless gutter installed a few days ago. Now the gutter is primed and ready for the color to match the eavespklongballJun 14, 2009
|
|
June 14Kitchen window frame above the new counter built inpklongballJun 14, 2009
|
|
June 14The master bedroom and office area window framespklongballJun 14, 2009
|
|
June 14This is a view of the pumphouse construction today.pklongballJun 14, 2009
|
|
June 14Today I decided to shoot a few pics of the window frames before the installation of the windows. This is the second bedroom area.pklongballJun 14, 2009
|
|
June 14View of the window frames in living room areapklongballJun 14, 2009
|
|
June 14Here we have today's view into the master bath and the shower zone with the built in bench added for sitting down and enjoying a relaxing shower. A shower unit will be installed near this benchpklongballJun 14, 2009
|
|
June 14Opposite side of the shower zone and the cut out in the wall that will allow storage of any personal items for showeringpklongballJun 14, 2009
|
|