happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Last additions
P6222449.JPG
June 22Master bath vanity with the Homewood doors in place and almost completepklongballJun 22, 2009
P6222450.JPG
June 22I took several pics of the masking tape as I could not believe they actually knew about this stuffpklongballJun 22, 2009
P6222451.JPG
June 22Another masked off door frame. pklongballJun 22, 2009
P6222452.JPG
June 22One of the paint crew cutting in around the insde of the window framespklongballJun 22, 2009
P6222453.JPG
June 22Today the painting crew started the inside paint. Before they began they used some masking tape to protect the wood. I don't know how well the tape shows in the photos here and other pagespklongballJun 22, 2009
P6222444.JPG
June 22The cabinet with the Homewood doors in place. We decided on these to make the install easier. We are leaving the bottom of the gas bottle area open to allow and LPG that could possibly leak out to vent out there. As I recall the gas is heavier than air and will sink to the bottom of the cabinet.pklongballJun 22, 2009
P6222445.JPG
June 22The outdoor cabinet for the shoes and the gas bottles now is almost finishedpklongballJun 22, 2009
P6222446.JPG
June 22From the veranda the view of the pump room and waitng for the tile and floorpklongballJun 22, 2009
P6222447.JPG
June 22The cabinet man came out yesterday to cut the openings for the HOB and the sink. They enede up removing one interior partition as the sink is bigger than they planned. Or should I say did not plan. They had pictures and drawings of the exact sink we bought and the last 3 weeks we had the sink but they still built the base for the sink too small, plus its not centered on the window as I asked.pklongballJun 22, 2009
P6222448.JPG
June 22Today's view of the cabinets waiting now for the wall painting and tiling.pklongballJun 22, 2009
P6222439.JPG
June 22Inside of the walk in gate area showing the gray plastic conduits for the lightspklongballJun 22, 2009
P6222440.JPG
June 22Front wall view. We decided to have the land developer build his "free" included wall rather than pay for one now as the budget is getting tight. We did add the walk-in gate and widen the drive in one meter.pklongballJun 22, 2009
7141 files on 596 page(s) 435

Debug Info 
Debug Output: show / hide