happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Last additions
P6262476.JPG
June 26A shot looking east at the front and side walk. The land is nice and flat for now.pklongballJun 26, 2009
P6262477.JPG
June 26Here's a view of the back side of the place with the land leveled and most of the railings in place and finishedpklongballJun 26, 2009
P6232465.JPG
June 23Door man hanging the bedroom doorpklongballJun 26, 2009
P6232468.JPG
June 23The side walk is nearly finished with the sand wash top.pklongballJun 26, 2009
P6232469.JPG
June 23Here is Tile man 1's main helper. She does all the finish work after tile man sets the tile. In this case the granite install cleaning and finish groutpklongballJun 26, 2009
P6232470.JPG
June 23Tile man 2 mixing up a batch of the sand wash for the side walkway.pklongballJun 26, 2009
P6262471.JPG
June 26The look of the front today after the land was leveled out and now the front wall gate openings have been added.pklongballJun 26, 2009
P6232458.JPG
June 23Here we have the Old door man preparing to install the first door. This happens to be the bedroom. We are using all Hafele door hardware.pklongballJun 26, 2009
P6232459.JPG
June 23View of the pump house status todaypklongballJun 26, 2009
P6232460.JPG
June 23We hired a dirt contractor to plow the yard with his tractor to pile up the junk and then clear away the brush and weeds and then add some clean fill dirt and level it. Here he is just beginning the process.pklongballJun 26, 2009
P6232461.JPG
June 23It took a couple of hours but when done it took 10 loads of dirt and a little work to get it leveled out. Cost 8500 for the dirt and tractor.pklongballJun 26, 2009
P6232462.jpg
June 23The side walk is now sand washed and looks good.pklongballJun 26, 2009
7141 files on 596 page(s) 434

Debug Info 
Debug Output: show / hide