Last additions |
Starting the wall buildKitchen & Utility Room AreachangnoiDec 06, 2009
|
|
|
Upstairs Ring Beams showing bathroom pipeschangnoiDec 06, 2009
|
|
View from the road After the pourchangnoiDec 06, 2009
|
|
Whole of upper ringbeams with formwork removed.changnoiDec 06, 2009
|
|
Ready for the Pour to startchangnoiDec 06, 2009
|
|
Starting Concrete Pour from the backUtility Room, Kitchen, hallway , balconey to rightchangnoiDec 06, 2009
|
|
Starting the Ground floor pour from the backMum bedroom, ensuite, hallway and GF balconey to rightchangnoiDec 06, 2009
|
|
Starting the Ground floor pour from the backMums bedroom and ensuite areachangnoiDec 06, 2009
|
|
Used Euka Poles in LH AlleyThis view shows the tight conditions the guys are working in due to the small width of the property (10m wide but 30m long)changnoiDec 06, 2009
|
|
Right Hand Alley full of Euka Poles from ScaffoldingThis view shows the tight conditions the guys are working in due to the small width of the property (10m wide but 30m long)changnoiDec 06, 2009
|
|
Mums Ensuite before Concrete PourchangnoiDec 06, 2009
|
|