|
Last additions |
|
|
|
Roof frame and tilerucus7Jun 20, 2010
|
|
Foundation of pier1 cubic metre of concrete was poured into the foundation, the rebar cage was set, and the first concrete pipe as lowered into position. By next morning is was all dry. Max&Bee-in-CMJun 19, 2010
|
|
Drill moldThe wooden board for the drill holes.Max&Bee-in-CMJun 19, 2010
|
|
Metal platesThe metal plates in the back of the car, looking for a drill shop now. Need to drill 3 plates.Max&Bee-in-CMJun 19, 2010
|
|
Bottom part of pier doneThe concrete pour went smoothly. Its as solid as a concrete pier.Max&Bee-in-CMJun 19, 2010
|
|
Hole #1The hole is dug for the telescope pier.Max&Bee-in-CMJun 19, 2010
|
|
Hole #1 closedThe soil people mistakenly dumped soil and closed the hole dug for the pier.Max&Bee-in-CMJun 19, 2010
|
|
Hole #2The second hole is dug out by hand, size is 1 m cubed.Max&Bee-in-CMJun 19, 2010
|
|
Metal rodsThe rods that will be used to secure the 30 cm X 30 cm metal plates to the concrete pier and each other. They will need to be cut to size.Max&Bee-in-CMJun 19, 2010
|
|
7141 files on 596 page(s) |
|
|
|
|
|
382 | |
|
|
|
|
|
|
|