Making the rebar columnsMax&Bee-in-CMJun 25, 2010
IMG_4166.JPG
Hard at workMax&Bee-in-CMJun 25, 2010
screenshot_4~0.jpg
the plot with simple layoutthe plot accquired due to proximity to family, later was added fill (abt. 1.3m) & set 3 moons or 5 rains for consolidation. A bit of consternation but upon seeing construction, no worries. Seems the area norm. P/L = property line, Fill=area filled to elevate above road and drain ditchesotis-aJun 25, 2010
10758b.jpg
footing hole going down all in!normal steel cement const. chaing raiotis-aJun 25, 2010
e9636f18.jpg
column formsnormal steel cement const. chaing raiotis-aJun 25, 2010
d047505.jpg
q/c team make steel inspectionnormal steel cement const. chaing raiotis-aJun 25, 2010
ebe85e03.jpg
beams going innormal steel cement const. chaing raiotis-aJun 25, 2010
e9634816.jpg
columns 1st levelnormal steel concreteotis-aJun 25, 2010
House_Plan.jpg
House PlanThe house design is based on Australian home designs from Henley Properties and Simond's Homes. The entrance, study and master bedroom are based on Henley Properties designs, with the rest of the house following design ideas from Simond's Homes.

The area of the house is 250 square metres (including the front porch and rear outdoor area). The quoted price from a builder was 1.7 million baht, however we have decided to manage the project in-family, and are sourcing all the materials ourselves.
1 commentsMax&Bee-in-CMJun 25, 2010
IMG_4101.JPG
More soilMax&Bee-in-CMJun 24, 2010
IMG_4291.JPG
Local small governmentHad to go to the local government office to lodge the building plans, after they had been signed by an engineer.Max&Bee-in-CMJun 24, 2010
IMG_4320.JPG
Rebuilding worker houseThe worker's house had to be removed to make room for soil infill, then rebuilt again.Max&Bee-in-CMJun 24, 2010