Last additions
IMG_4487.JPG
Column shutteringFixing the shuttering for the columns before concrete pour into the top.Max&Bee-in-CMJun 25, 2010
IMG_4488.JPG
Masked workerThe mystery worker works on the column shutteringMax&Bee-in-CMJun 25, 2010
IMG_4499.JPG
Columns alignedMax&Bee-in-CMJun 25, 2010
IMG_4503.JPG
Concrete floor for the bathroomThey put down some concrete to give a better floor for the outdoor bathroom. Fresh water is pumped up from 60 metres.Max&Bee-in-CMJun 25, 2010
IMG_4457.JPG
The MaskI like the mask on this fella.Max&Bee-in-CMJun 25, 2010
IMG_4471.JPG
More soilWe told the soil man he is not getting paid until I see 50cm straight and level across the whole property - he had another 120+ trucks delivered.Max&Bee-in-CMJun 25, 2010
IMG_4472.JPG
Metal shutteringReady for assemblyMax&Bee-in-CMJun 25, 2010
IMG_4474.JPG
Metal shutteringWe rented metal shuttering for the columns. Cost = 3,650 baht for a few weeks.Max&Bee-in-CMJun 25, 2010
IMG_4483.JPG
Concrete poured for foundationsMax&Bee-in-CMJun 25, 2010
IMG_4429.JPG
PPS concrete truckThe truck from the local companyMax&Bee-in-CMJun 25, 2010
IMG_4432.JPG
Watch out belowThe worker directs the flowMax&Bee-in-CMJun 25, 2010
IMG_4434.JPG
Levelling the concreteThe worker directing the concrete pour and leveling the concrete.Max&Bee-in-CMJun 25, 2010